New construction homes in Fresno, Clovis and Madera
Builders around Fresno are selling new homes in master-planned areas in Clovis, north Fresno and Madera County along SR 41. This guide covers how a builder sale works, what to register and inspect, which costs to check, and where building is concentrated.
- Where it's built
- Master plans in Clovis, north and northwest Fresno, and Madera County along SR 41
- Your agent
- Register on your first visit; each builder sets its own policy
- Disclosure
- A DRE public report, given before you are obligated to buy
- Warranty floor
- At least 1 year on fit and finish, under California Civil Code 900
- Solar
- Required on new California homes since Jan. 1, 2020
- Special taxes
- Mello-Roos CFDs and HOAs vary by tract. Check each one.
New construction today
Most new homes in the area come from production builders selling from model homes and sales offices inside planned communities. Builders that list current Fresno-area communities on their own websites include Granville Homes (Parc West and Belterra in Fresno, Copper River Ranch, and Deauville East in Clovis), Bonadelle Neighborhoods (Traditions at Heritage Grove in Clovis and Sunnyside Heights in Fresno), McCaffrey Homes (Tesoro Viejo) and Trumark Homes. A 2025 Lennar release named Fanucchi Ranch, at Hayes and Dakota in northwest Fresno, and Corinthalyn, at Highland and Ashlan in Clovis.
What each builder offers changes as communities open new phases and sell out. Some homes are sold before construction, with time to pick a lot and finishes; others are already built or under way and sold as quick move-ins.
The price you see advertised is usually a base price for the floor plan and standard finishes. Lot premiums, design-center upgrades and options are added on top, so compare finished costs rather than base prices.
- Who you deal with
- The builder's on-site sales staff, who work for the builder
- Contract
- The builder's own purchase agreement
- Key document
- DRE subdivision public report
- Energy code
- 2025 standards apply to permits filed from Jan. 1, 2026
Where new homes are going up
-
Loma Vista
Southeast ClovisA 3,300-acre planned area, past 70% buildout and planned for about 10,700 homes. See our Loma Vista guide.
-
Copper River Ranch
Northeast Fresno, north of Copper AveA golf community where Trumark Homes and Granville Homes are selling new homes in 2026. See our Copper River Ranch guide.
-
Tesoro Viejo
Madera County, east of SR 41A master-planned town of up to 5,190 homes, with McCaffrey Homes, De Young Properties and Lennar selling. See our Tesoro Viejo guide.
-
Riverstone
Madera County, south of Tesoro ViejoA master-planned community of about 2,000 acres in Madera County, north of Fresno's River Park.
-
Harlan Ranch
Northeast Clovis, by Highway 168A finished master plan with more than 1,500 homes, mostly built from 2006 into the mid-2010s, now sold as resales. A useful comparison for newer homes. See our Harlan Ranch guide.
-
Sumner Hill
Madera County, beside Tesoro ViejoA gated tract of 49 custom-home lots on the river bluff, all sold by 1989, where a custom build still comes up now and then. See our Sumner Hill guide.
How a builder sale works
- Register your agent
-
Builders pay buyer's agents under their own co-broker policies, and many require the agent to come with you, or register you, on your very first visit to the community. If you visit alone first, the builder may decline to pay an agent you bring later. Bring your agent, or have them register you first.
- Whom the sales staff work for
-
The on-site sales team represents the builder. A buyer's agent represents you, not the builder.
- Lot premiums
-
Builders charge more for lots with features such as views, bigger yards, corner or cul-de-sac positions, a preferred orientation or closeness to a park. Ask for the premium on each lot you consider.
- Upgrades and the design center
-
The design center is where you pick finishes and options beyond the standard package. Set a budget before your appointment, and put money first into items that are hard to change later, such as structural options and flooring.
- Incentives and preferred lenders
-
Builder incentives, such as closing-cost credits and rate buydowns, often depend on using the builder's preferred lender, and rate buydowns almost always do. If a builder refers you to an affiliated lender or title company, federal rules require a written disclosure of the relationship, and you can't be required to use it except in narrow cases. Get quotes from at least two outside lenders and compare the total cost of the loan, not just the incentive.
- The public report
-
Before marketing a new subdivision, the builder must get a public report from the California Department of Real Estate. It covers the CC&Rs, HOA costs and other disclosures, and you must receive it before you are obligated to buy. Read it.
- Inspections
-
New homes are not flawless, and once the walls close, you can't see what's behind them. Hire your own inspector for a pre-drywall inspection, when plumbing, wiring, ducts and framing are still visible, and a final inspection before closing. Some buyers also inspect before the slab is poured and again before the one-year warranty ends. Ask the builder's policy on access first.
- Warranties
-
California law requires at least a one-year written warranty on fit and finish, covering cabinets, flooring, countertops, walls, paint and trim. State construction standards set separate time limits for other items, such as 4 years for plumbing and electrical and up to 10 years for most claims. Builders add their own written warranties, so read the terms.
Taxes, HOAs and solar, and schools
- Mello-Roos and CFDs
-
A community facilities district, created under the Mello-Roos Community Facilities Act of 1982, levies a special tax on top of regular property tax to pay for streets, water, sewer, schools, parks and other public works in newly developing areas. The amount follows a formula set for each district, often based on square footage or lot size, not home value. Ask the builder for the district name, current tax and maximum tax for your lot.
- HOAs
-
Many newer master-planned areas have homeowners associations. Dues and what they cover vary by tract, and the DRE public report lists HOA costs and the CC&Rs.
- Solar
-
California's 2019 Energy Code made solar panels standard on new homes from Jan. 1, 2020, sized to the home's expected yearly electricity use. The 2025 code, for permits filed from Jan. 1, 2026, expands heat pumps in new homes. Ask whether the solar system is owned, leased or under a power purchase agreement, and whether a battery is included.
- Schools
-
New communities fall in different districts: Clovis Unified, Fresno Unified, Sanger Unified in parts of Loma Vista, and Chawanakee or Golden Valley Unified in the Madera County master plans. See our Clovis Unified and Fresno Unified guides. Boundaries change, so confirm any address with the district.
New construction, by the numbers
Before you sign
-
Notice before a lawsuit
Under California law, a homeowner must send the builder written notice of a construction claim before suing. A request through the builder's customer service process does not count as that notice.
-
Inspect before the warranty ends
Most builders offer a one-year warranty, and inspectors suggest a check at 10 to 11 months, after the house has settled, so items can go on the builder's list in time.
-
A developer can be the only voter
When a CFD forms on land with few registered voters, the election can be held among property owners, and the developer may be the only voter.
-
Registration can expire
Some builders' agent registrations expire, after 30 days in one example, and must be renewed. Check the policy for each community you visit.
New construction questions
Do I need my own agent to buy a new build?
No, but the builder's sales staff represent the builder. Many builders pay a buyer's agent only if the agent registers you on your first visit, so bring your agent or have them register you before you go.
Can I get an inspection on a brand-new home?
Yes. Buyers often hire their own inspector for a pre-drywall inspection and a final inspection before closing, and again before the one-year warranty ends. Ask the builder's policy on access.
Do new homes in California have to have solar?
Yes. The state Energy Code has required solar panels on new homes since Jan. 1, 2020. Ask whether the system is owned, leased or under a power purchase agreement.
What is Mello-Roos?
A special tax levied by a community facilities district to pay for public works, such as streets, schools and parks, in newly developing areas. It is billed on top of regular property tax, so ask for the current and maximum tax for each lot.
What warranty comes with a new home in California?
State law requires at least a one-year written warranty on fit and finish, and state construction standards allow claims on other items for up to 10 years. Builders add their own written warranties.
Where are new homes being built around Fresno?
Largely in master-planned areas such as Loma Vista in Clovis, Copper River Ranch in northeast Fresno, and Tesoro Viejo and Riverstone in Madera County.
Thinking about a new build?
Baylen and Chris can register with the builder as your agents on your first visit, compare lots, upgrades and incentives, and line up your inspections, or price your current home for sale.
Trafton Home Team, brokered by Real (DRE #02022092). Baylen Trafton, DRE #02026482.
Sources and photo credits
- Granville Homes communities (builder website)
- Bonadelle Neighborhoods communities (builder website)
- McCaffrey Homes (builder website)
- Trumark Homes neighborhoods at Riverstone (Trumark Homes, 2024)
- New home collections in the Fresno area (Lennar, 2025)
- Homes popping up at Madera County's newest master-planned community (ABC30, 2017)
- How to register your buyer with a builder (NewHomeSource Professional)
- Builder pricing, lot premiums and upgrade costs (Edge Homes)
- Builder incentives and preferred lenders (Zillow)
- Affiliated business arrangements, 12 CFR 1024.15 (CFPB)
- Subdivision public reports (California Department of Real Estate)
- New-home buyers may want to consider phase inspections (NAR, 2024)
- California Civil Code section 900, fit and finish warranty (Public.Law)
- California Civil Code section 896, construction standards (Public.Law)
- California Civil Code section 941, time limits (Public.Law)
- California Civil Code section 910, notice to the builder (Public.Law)
- Mello-Roos (Wikipedia)
- California Civil Code section 1102.6b, special tax disclosure (Public.Law)
- 2019 Building Energy Efficiency Standards FAQ (California Energy Commission)
- 2025 Building Energy Efficiency Standards (California Energy Commission)
